HCP Job Report 40 :Sedimentation Tank Cleanup for Bali Wastewater Treatment Plant in New Taipei City, Taiwan

Last updated: 2 ก.พ. 2566  |  620 จำนวนผู้เข้าชม  | 

HCP Job Report 40 :Sedimentation Tank Cleanup for Bali Wastewater Treatment Plant in New Taipei City, Taiwan

HCP Job Report 40 :Sedimentation Tank Cleanup for Bali Wastewater Treatment Plant in New Taipei City, Taiwan


◎ Models Installed : AF Series - Submersible Sewage / Wastewater Pumps


◎ Description:
                    The Bali Wastewater Treatment Plant in New Taipei City treats 1,320,000 m3 of wastewater from the Taipei Metropolitan Area daily. The treated water is released into the Taiwan Strait through a 6,600m-long pipeline. Each year, the sludge that builds up in the tank must be cleaned. A total of 8 sedimentation tanks required cleaning; each tank’s volume is approximately 1,328m3. HCP PUMP AF Series Submersible Sewage/Wastewater Pumps were used for cleaning up the sludge efficiently. 5.5kW 100(150)AFE45.5 can pump 1.5m3 of water per minute at 12m head. The non-clogged impeller design has efficiently extracted the wastewater for cleanup to ensure good living standards for the residents of the Taipei Metropolitan Area.


Powered by MakeWebEasy.com
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ นโยบายความเป็นส่วนตัว  และ  นโยบายคุกกี้