HCP Job Report 40 : Sedimentation Tank Cleanup for Bali Wastewater Treatment Plant in New Taipei City, Taiwan

Last updated: 2 Feb 2023  |  618 Views  | 

HCP Job Report 40 : Sedimentation Tank Cleanup for Bali Wastewater Treatment Plant in New Taipei City, Taiwan

HCP Job Report 40 : Sedimentation Tank Cleanup for Bali Wastewater Treatment Plant in New Taipei City, Taiwan


◎ Models Installed: AF Series - Submersible Sewage / Wastewater Pumps


◎ Description:
                   The Bali Wastewater Treatment Plant in New Taipei City treats 1,320,000 m3 of wastewater from the Taipei Metropolitan Area daily. The treated water is released into the Taiwan Strait through a 6,600m-long pipeline. Each year, the sludge that builds up in the tank must be cleaned. A total of 8 sedimentation tanks required cleaning; each tank’s volume is approximately 1,328m3. HCP PUMP AF Series Submersible Sewage/Wastewater Pumps were used for cleaning up the sludge efficiently. 5.5kW 100(150)AFE45.5 can pump 1.5m3 of water per minute at 12m head. The non-clogged impeller design has efficiently extracted the wastewater for cleanup to ensure good living standards for the residents of the Taipei Metropolitan Area.


Powered by MakeWebEasy.com
This website uses cookies for best user experience, to find out more you can go to our Privacy Policy  and  Cookies Policy